Saturday, April 29, 2006

Dynevor Junction


We speed along the freight line following the M4; then through two tunnels.

The Llangyfelach tunnel is over a mile long.

At Dynevor Junction we cross the river Neath where two old ships are stuck in the mud at low-tide. A larger version of this picture is at Out & About.

It is then through Port Talbot and its vast steelworks, Bridgend and finally we arrive in Cardiff at 4pm.

We have a break of under two hours before the return journey.

Labels: , , , , , , , , , ,

0 Comments:

Post a Comment

<< Home